Major Iron Ore Mine in Brazil
A case study on the use of 3D-modeled stockpiles subdivided into ore quality polygons for strategic reclaiming, enabling improved material blending and reducing contaminants in plant feed.


Customer Challenge
Limited Visibility of Material Properties
Limited control and predictability over the plant feed grade – hourly basis needed – using weighted average grade (WAM) for stockpiles.
Failure to meet product specifications for alumina grade leading high peaks events of contamination.

How We Helped
Ore Quality Polygons using 3D Block Model
Use of 3D digital block models of ROM stockpiles to create ‘reclaiming polygons’ integrated into dispatch.
Establish priority areas of reclamation based on blending needs.
Iron ore, silica and alumina contents reported to the plant in real-time.

The Outcome
Reduced Daily Feed Variability and Contaminats
The Operations Team signals to the plant team more accurately which type of material mix is coming in on a daily basis (by polygons).
Reduction of the average daily deviation:
– Iron from 0.45% to 0.17%
– Silica from 1.3% to 0.7%
– Alumina from 5.6% to 4.4%
The increased traceability and predictability of the method helped reduce contaminant peaks events by 71% from 2021 to 2024.

Discover how the Stockpile & Inventory Optimization App can be applied to your operation






